감자칩 생산 라인

Potato Chips Production Line Configured for Your Product and Factory

Plan the complete route from fresh potatoes to fried, seasoned and packed chips with capacity, heating and automation confirmed per project.

Line at a Glance

Start With the Project Requirements

원료신선한 감자
완제품Fried potato chips in the required slice, flavor and package format
Suitable customer스낵 공장, new food projects, factory expansions and distributors
용량 접근 방식Determined by potato variety, slice thickness, frying time and packaging connection Reference configuration — confirmed per project
Configuration scope전압, heating, 재료, automation, packaging and layout are confirmed for each project.
Process Flow

From Raw Material to Finished Product

Each connected stage has a clear processing purpose; the final sequence is confirmed after product samples and factory conditions are reviewed.

  1. 세탁 & 필링

    Connected process stage

    Configured per project

  2. 슬라이싱

    Connected process stage

    Configured per project

  3. Rinsing

    Connected process stage

    Configured per project

  4. 희게하기

    Connected process stage

    Configured per project

  5. Dewatering

    Connected process stage

    Configured per project

  6. 전유

    Connected process stage

    Configured per project

  7. Deoiling

    Connected process stage

    Configured per project

  8. Seasoning

    Connected process stage

    Configured per project

  9. 포장

    Connected process stage

    Configured per project

Recommended Configuration

Equipment by Process Stage

프로세스Recommended equipmentPurpose
PreparationCleaning and peeling machineWash and peel incoming potatoes
SizingPotato slicerProduce the target slice thickness
Rinsing & 희게 하는Bubble washer and blanching machineRemove surface starch and condition slices
DewateringAir dryer or drainer튀기기 전에 표면 수분을 줄이세요
전유Batch or continuous fryerApply controlled time and temperature for the target product
FinishingDeoiler and drum seasoning machineRemove surface oil and distribute seasoning
포장Packaging systemConnect the finished product to the selected pack format
Configuration Decisions

What We Confirm Before Quotation

용량 & automation

전압 & utilities

Heating or cooling method

Food-contact material

Machine dimensions

Control requirements

Packaging connection

Workshop layout

FAQ

Questions Before Configuring the Line

Two-Stage Project Inquiry

Send Your Core Inquiry, Then Add Project Details

Stage 1 emails your inquiry immediately. Stage 2 lets you add engineering and purchasing details in a second linked message. Your country is identified from server-side visitor location data, so the form does not ask for it.

Stage 1: ~에 대한 1 minute
Stage 1 — send core inquiry
Please enter your name.
Please enter a valid email address.
Please tell us your raw material.
Please provide a target capacity.
Please add your target product or other key requirements.
Consent is required to send the inquiry.
제안 요청 whatsapp