Raw-material preparation
Sort and wash chili, tomato, garlic or other approved ingredients before crushing.
- Define trimming and sorting requirements.
- Separate dirty receiving from clean processing.
- Plan waste and drainage routes.
Crushing, pulping and texture
Select size-reduction equipment from the required seed, skin and particle specification.
- Clarify smooth puree versus visible particles.
- Confirm screen or pulper requirements.
- Test difficult recipes before final selection.
Cooking and pasteurization
Heating equipment is selected according to batch size, viscosity, agitation and the validated process.
- Recipe validation belongs to the product owner and qualified food technologist.
- Confirm steam or other heating utility.
- Provide cleanable transfer between hot stages.
Filling and layout
Bottle, jar or pouch format determines filling, closing, cooling and secondary packing connections.
What to Send Before Equipment Selection
Provide raw material, finished product, target throughput, package format, workshop dimensions, voltage, utilities, project stage and any local standard. These inputs allow a configuration discussion without inventing specifications.
